Page 42
Rev. 02 - 94753
Honey Bee Manufacturing Ltd.
2014 John Deere WS Swather
Operator’s Manual and Reference Guide
6. Disconnect the platform lift hose “A” at the block, using the valve tool provided in the compart-
ment. Connect the supplied hose “B” as seen in Illustration 3-25: Needle Valve - STC Fittings on
page 44. Now connect Hose A to the needle valve, as shown in the same illustration.
7. Slide the needle valve onto the mounting bracket, as Illustration 3-25: Needle Valve - STC Fittings
on page 44, and secure in place with the panel nut. Close the manual oat release valve on the
block (clockwise) and set a small ow rate on the needle valve (counter-clockwise.)
Units with serial numbers up to and including
320000 will use the needle valve assembly
shown here. Use components 2, 3, 5 or 1, 7, 4
depending on the year of the Power Unit.
Refer to Hydraulic Fitting
Naming Standards on page
page 141 for details on iden-
tifying hydraulic ttings.
Illustration A - Page 42: Hydraulic Control Block
Illustration B - Page 42: Needle Valve
Illustration C - Page 42: Needle Valve - Non-STC
Threaded Fittings
NOTE!
Comments to this Manuals